
Add to Cart
1. It is convenient to operate, automatic cement feeding, automatic mixing of cement slurry, automatic foaming of foaming agent, automatic delivery of foaming concrete.
2. Concrete Blocking Making Foaming Machine combines feeding machine, water adding device, mixing system, foaming system, delivery system together.
3. The machine adopts high pressure foaming technology with good foaming performance,even,high quality,unbreakable,accurate(foaming amount can be precisely controlled within mg).
Items | Unit | KFP-65-40A foam concrete machine |
Main motor | KW | 7.5 |
Output | m3/h | 10~12 |
Vertical delivery dist. | m | 40 |
Horizontal delivery dist. | m | 200 |
Particle size | mm | ≤15 |
Max. air pressure | Mpa | 3.0 |
Output pressure | Mpa | 1.5 |
Dimensions (length*width*height) | mm | 1800*1200*1500 |
Main machine weight | Kg | 1300 |
Mixer dimensions | mm | 1600*800*1300 |
Mixer weight | Kg | 150 |
CLC Block Foam Concrete Machine Application:
1. It is convenient to operate, automatic cement feeding, automatic mixing of cement slurry, automatic foaming of foaming agent, automatic delivery of foaming concrete.
2. Concrete Blocking Making Foaming Machine combines feeding machine, water adding device, mixing system, foaming system, delivery system together.
3. The machine adopts high pressure foaming technology with good foaming performance,even,high quality,unbreakable,accurate(foaming amount can be precisely controlled within mg).
FAQ
---Foam Concrete Pump. Cement Foaming Machine
1. Q: Which model should we choose?
A: To recommend the most suitable model, please tell us:
- Material: cement, cement&sand, or other materials
- Capacity (-m3/h) :
- Max aggregate size (-mm) :
- Volume weight (-kg/m3) :
- Delivery distance (horizontally / vertically) :
2. Q: What is the vulnerable part? How many spares should we prepare?
A: After long-time running, some parts may get worn. We will offer some spares for free.
Referring to the service life of each part, we will put a rough estimate of requested spares according to your project scale.
3. Q :How to pay for this order?
A: Generally, TT, 30% deposit 70% before shipment;
L/C at sight (high bank charge, not suggest, but acceptable);
100% TT in advance (especially for small amount and spare parts etc.)